Showing posts with label Lode. Show all posts
Showing posts with label Lode. Show all posts

Wednesday, 8 May 2019

Reach Ride 2019


So the Reach Ride 2019, woo hoo!

Again, lots of people grab hold of their bikes and ride out to Reach to see the 800 year old fair. It's around 14.5 miles in length, but that's not the thing people take away from this ride. What is the big thing is cycling with so many others enjoying the chat as we go along.

I had so many conversations with people I knew and people I'd never met before and may not meet again. Some people I'd recognise from previous years, and they'd always be new people coming with joyful ideas and positive involvement with riding.

Here's the route, with the main route in red and my short cut home in blue. Note that the shortcut home isn't possible as the busy road through Stow-cum-Quy is not passable by our larger group with a wider range of abilities.

It really is worth opening this up larger in a separate window.

Open Map Larger.

So this year's video is a combination of the view forward and the reverse "faces" view. I do like ot see where we are going and it brings people in seeing what's about to happen in the facecam, possibly making it easier to spot yourself!

Here's the video of the route. Look out, music!             (Go HD see * below)

00:11 Starting from The Guildhall
00:30 And onto Sidney Street
01:30 Explaining the TdF bunting
01:45 The first jam
02:30 A patient and happy taxi driver!
02:45 Zooming along at 8mph on Jesus Green
03:45 Camera fail!
05:00 Further jams at Cutter Ferr Bridge
07:00 Getting up to the front in a record distance
07:40 New path approach to Fen Ditton Lane
08:00 Loosing the leader's flag
08:45 Stopping in Bottisham
09:35 Final big pedal in a group to Lode
11:10 Reaching Reach!
































* How to go HD.

Thursday, 4 January 2018

#CamRideHome on New Years Eve Along the Quy-Lode Cyclepath


So a few decided to make the trip up to the new cycleroute that has been set up between Stow-cum-Quy and Lode. This was changed from a Friday evening to a Sunday lunchtime ride as it was New Years Eve (and few could do the Friday slot!). It had the benefit of ending at The Shed, a new pub in Lode, just about lunchtime. Hey Ho!


Setting Off (photo by Simon Nuttall)

Here's the route planned. A fairly simple jaunt along NCN51 out from Cambridge, which is mostly off-road, and when on- it's very quiet. Note that we came back along the road to the Missing Sock (another great venue), merely to see waht it was like (very quiet).




So to the route itself. It starts where the offroad NCN51 crossing of the B1102 in Stow just north of the A14 roundabout and makes it's way through Stow towards the Quy end of the village (good history here).

This first section can be a little intimidating. People driving have only just slowed down for the village and still have expectations of making fast progress. There are not many easy places to pass, especially with oncoming traffic. Why wasn't the off-road path started here? Well, probably for a number of reasons. Could it change, I hope so, although it may be more difficult to do so as a secondary change.



Just about where Stow becomes Quy, there's a turn off onto a small, quiet side road. It's still direct and makes for a nice relaxing change from the previous section. This continues into Quy Court Business Park, which also has slower speeds, although also suffers from reduced visibility and the likelihood of people driving not looking as they park.

After that is the off-road path itself. This is lovely. It starts off being separated from the road by a hedge, a great reduction in noise. Sadly, this doesn't go for the whole length, but it does do it's best and it's clear why it can't.


Cyclepath Start

At the Lode end, near Anglesey Abbey, the route crosses back over th B1102 and then proceeds to the Lode turn. In fact the off-road path continues for around 50 metres into the village. From there it's a quiet ride down to The Shed.


Arrival at The Shed


And here's the video of the route. A few glimpses to the route itself, then a quick look at the good (of which there's a lot), the bad (and there is a bit), and the ugly (thankfully none!). Look out, soundtrack!

(Go HD see * below)

0:11 Starting from Cutter Ferry bridge
0:56 Stow Road Section
1:32 Turning onto quiet road in Quy
1:50 Quy centre
2:00 Start of the off-road section
2:40 Anglesey Abbey Road Crossing
3:09 The Shed, Lode
3:14 Some return clips



So, the new path should be welcomed, it's a helpful addition to the route network. It should mean more people ride, although it's not really going to include quite a few people who really won't like that first road section. If it's to be a route, it's only going to be as good as it's weakest point.

So, looking at the road section, why wasn't it changed. Simply, it's quite difficult. However, it's not that difficult, and there is space. Sticking with the same side as the built route, and there is room most of the way. True, it means costly moving of lamp-posts and other street furniture. Opposite The Wheatsheaf, the space on that side runs out. There is still roadspace, so it's a question of moving the kerbs, again costly for cyclepaths.


Space on Right

Could it be done later? Yes, I hope so. After all, we are just finishing up the same kind of project, with similar issues in Harston. And I'd suggest the idea of a quick win was the reason why this wasn't done to start with.

Once at the turning onto the quiet road, there's plenty more space on both sides. And this continues along the main road apart from a small section just after the crossroads. Again, some clever considerations here would enable this to be a fully linked path. Of course, the quiet road could still be used, which wouldn't be absolutely ideal, but would allow for some of the less confident riders.


Space Either Side

There are a couple of potential issues with the path itself.

First, in two places trees come close to the route. Has enough been done to ensure there's no root damage from the trees. We've recently suffered from this on the Guided Busway (yes, that short time and we have it) and can see many examples around town where this is the case. You don't see it as often in roads, why would that be? A better substructure?


Trees very near path, has sufficient been done to stop root damage?

And second, There is at least one tractor crossing. Again, with several tons moving across the path, not too regularly, just enough, has the path surface and substructure been designed to deal with this? I'm not sure. I have seen what other places do to protect fomr this kind of damage, and it doesn't look like we've done anything like enough.



Tractor Crossing, is their adequate surface and substructure here?

So, onto the last section, the crossing and the route up to Lode.

After the nice section away from the road, the crossing comes at you quite quickly. It's quite difficult to see through the trees and work out when it's okay to cross. People riding do like a good chance to look around, see whether they can plan a route across and do it quickly without stopping. This isn't possible here. There is an island, but we were all too nervous to use it. It looks very small and there's a worry about being clipped whilst waiting. And if we want this facility to be used by lots of people, we need to make it so lots of people can use it at the same time, not one or two.


Road Crossing near Anglesey Abbey

Finally, the path up to the Lode turn. This is well known for being the Anglesey Abbey overflow car park. Cars will litter this place at busy times. I hope some contingency has been made to deal with this issue.

Here is an example. Now, the car isn't parked all the way across the path, but it does take the whole space up. When passing a parked car, riders are taught to be at least an open doors width away, in case someone in the car opens the door. The Dutch Reach, as good as it is, will only reduce the numbers of poeple who do open doors without looking. It's still better to avoid the area when riding.


Parked Car on Cyclepath

Finally, we did see the sun, if only for a bit and a bit muted!


The Hint of Sun on Return

All in all, a lovely ride out, and I like the new path, with some reservations. Convivial chatter along the way and great food at The Shed made it all a pretty good New Years Eve.











* How to go HD.

Thursday, 5 May 2016

Reach Ride 2016


All the fun of the ride to Reach Fair. Shout out where you are on this video! #ReachRide




The Reach Ride on Bank Holiday Monday May 2nd 2016. Shooting along the 14.3 mile route to get to the 800 year old Reach fair. Shout out if you spot yourself!

Tuesday, 5 May 2015

Reach Ride - Monday 4 May 2015


The Reach Ride goes from Cambridge town hall to Reach, a village around 10 miles north east from the city. The goal is the Reach Fair which has been running for over 800 years since King John granted it a charter.

The Reach Ride has become a very popular ride amongst Cambridgeshire residents. People travel to Cambridge to do the ride from all over the county. The seat count reached over 800 again this year.

It's a good natured ride and is frequented by road racer types as well as families. The pace is aimed at the latter, so it makes it very welcoming across the widest spectrum of riders. It's great to see even quite young riders happy to take on the 27 miles round trip. When it's split into two, and with the promise of ice-cream and rides in the middle, it's a very attractive proposition!

And it's not only riders. That good humour extends across people outdoors. I don't think I've had so many smiles and friendly greetings when out riding normally. Yes, it happens, but rarely, for example, from single women out jogging or walking the dog. Perhaps it's one of those few chances we have to remind ourselves that normally people are good and we don't have to behave as if everyone is out to get us all the time.

There was a little confusion this year as the Mayor's cycle couldn't use the official route. This should really be seen as a little nudge that cycle-paths should be planned with all types of cyclist in mind. Not everyone is on two wheels. When I arrived on time for the proper start, everyone was already gone. And in trying to catch along the published route I managed to overtake main party quite early on!

As a result of trying to catch up with a group that was quickly behind me, I managed to have lots of time at the Reach end. I settled on exploring up through Wicken Fen and back round via Upware before the fair, then a brief rumble out to Burwell and back after lunch. I can't help feeling that some people, like myself, who may not have a great fascination for the actual Fair, might like to take a wander further up to Wicken Fen as a more official trip. I pushed it a little too far this time, managing a total of 47 miles. And "bonking" around 2 miles from home.

I managed to get several clips, and did manage to do several passes of the (smaller) group on the way back. Faces are always good on these rides, please tag yourself!

Click here to see the map bigger.





Slightly Lonely Journey There  (Go HD see * below)

0:11 A few people still at the start mopping up.
0:45 The normal jam under Victoria Avenue completely missing!
1:25 Relief at the first signs of a group.
1:40 Not a very big group though, huh?
2:25 Newmarket Road Park & Ride, some more groups, but not moving, huh?
2:30 Small discussion about ride. I continue.
3:25 A few stragglers at Quy, where is everyone?
3:40 Last rider? Unbeknown to me, I'd already passed the main group!
4:20 Bottisham centre.
5:05 Swaffham Bulbeck centre. Empty roads!
5:33 Road cyclists pass.
5:50 Swaffham Prior centre.
6:07 Closed Roads! Although this proved a little unreliable.
6:50 Reach Fair!



People on the Way Back (Go HD see * below)

Apologies for the sound track, it just seemed so appropriate!
0:11 Final look at the Fair
0:30 An awful lot of parked cars for a closed road?
0:43 A car, even more strange for a closed road!
1:11 Road Closed sign. Ignored by a lot of drivers. Illegally.
1:30 Nice to pass lots of riders after the mornings mix-up!
1:50 A good look at the front riders, face on!
2:30 And back to passing the group again
3:20 Another look back at the riders coming past.
4:15 A couple heading to Waterbeach, needing to walk some of the way.
4:40 And into Lode.
5:10 And the main Quy Road, nearly back up to the front.



Wicken Fen and Upware Circuit (Go HD see * below)

0:11 Leaving Reach heading north then east to Wicken Fen.
0:50 Some riders! Hmm, and a car on a closed road
0:54 Camera fail, restart at first junction.
1:35 Bridge over Reach Lode. Very nice!
1:49 Rejoined proper track
2:20 Very awkward bridge, I had trouble with just a little day bag.

              This is a barrier to quite a few riders, I expect.
2:55 Main part of Wicken Fen, lots of riders! Ely people coming to Reach Fair?
3:00 With space available and people walking and riding, a bit more path width?
3:45 Another camera stop to look up route round horrible A1123 road.
4:45 Pretty rough track, probably not good in winter.
5:00 The Upware road! 3 of 7 car passes were not good.

              This is the alternative to the problematic Wicken Fen bridge?
6:00 Upware! Always seemed so fantastically distant
6:45 This is mapped as an unclassified road, not a track!
7:30 Back on the NCN11 cycle-route.
7:45 Road Closed being ignored by drivers, again.
8:10 Pulled in to let a car pass.
8:30 Lots of non-local parked cars
8:40 To the cycle parking!



Burwell Short Circuit (Go HD see * below)

0:11 Bit confused by cyclists coming towards me on this side of the road!
0:13 And car on the other side?
0:18 Ah, all becomes clear, walking/riding one side, cars managed on other, very good!
0:24 Driver doesn't really understand road controls, can't go up to it!
0:35 Dip out into car space as none coming.
0:43 End of control section, take back road to Burwell.
0:50 Quite a few people walking and riding from Burwell.
1:03 And a driver!
1:12 Onto a back track up the Burwell Lode.
1:28 Burwell centre.
1:41 Turn back towards the Burwell Lode.
1:50 And back onto the back road back towards Reach.
2:05 Lots more people walking down the path, some the same as before!
2:11 Dad pushing young daughter learning to ride, Excellent!
2:21 Back to the road control.



Return from Lode (Go HD see * below)

0:11 Last big cluster of people, going forward
0:49 Bottisham centre.
1:10 And back towards Quy, be good when the Lode-Quy cyclepath is done!
1:15 Got caught by another faster rider, good chat along the way!
1:28 One of the fast little groups.
2:02 Road crossing in Stow-cum-Quy.
3:10 Newmarket Road Park and Ride.
3:45 Road Crossing in Fen Ditton.
4:40 Back to Riverside.
5:00 My final bit on the main route, I bonked after this!



* How to go HD.