Thursday, 25 August 2016

New Railway Bridge and Station Access



So the access to the "Carter" Railway Bridge and links through into the station have just been improved. Just how much better is it?

Contents


How It Was

This is the way it used to work (click images for video).

Over Railway Bridge from Devonshire Road
Showing limited access, conflict between directions travelled


From Railway Bridge to Devonshire Road
Showing limited access, conflict between directions travelled, and limited visibility


Station Carpark access
Showing narrow twisting space, conflicting between walking and riding




The Plans

Well the plans [PDF] have been around for a few years now. As well as some comments on Cyclescape, showing there were discussions over this plan in 2013. Interesting to note that there were limitations because of the Travis Perkins site. Given that's a time limited issue, were the plans compromised to get them in earlier (and is 3 years really "earlier"?).

So, 3 basic updates.
  • adding a segregated ramp following the same route that a lot of people on bikes already follow
  • widening the access points
  • ensuring reasonable segregation between walking and riding





In Reality


In reality, this has happened (general and markings videos below). Note that I've included the bit under the bridge into the railway station rather than the bridge, although the dimensions are a bit odd. This is the area of focus to start.




Rather than kerbed pavements, there's a lot of painted lines in the station car park. Not only under the bridge, but along the walking access to the station. I hope this is because this area of the station is under development and is likely to alter. I don't think it should remain like this. Kerbs are the best way of segregating transport modes, specifically people driving from those walking. Paint does diddly squat.

So the section under the bridge seems a little random with some interesting pavement issues. Note that all people walking are aiming for (or coming from) the section of "pavement" to the bottom right which leads into the station. On the video below, you'll see that despite the large area actually under the bridge, an amount of it is taken by motorbikes being parked (not particularly well). And there is no pavement to the right of the cycleroute under the bridge. It works it's way round 1 parking space, and 1 only. Finally, the red tarmac, usually denoting cyclespace seems to have spilled out over the pavement between the steps up to the bridge and Devonshire Road. This just adds to the confusion here.

Now, looking at where people walking have to cross people riding, the source of most conflict in a properly segregated scheme. So, if walking along:
  • Bridge - Devonshire (towards Tenison Rd, left of plan): C and D
  • Bridge - Devonshire (towards Mill Rd, above plan): A and B
  • Bridge - Station: E
  • Station - Devonshire (towards Tenison Rd): E, A and D
  • Station - Devonshire (towards Mill Rd): E, A, and B
  • Along Devonshire: B and D
That's a total of 13 crossings, 3 of which are doubles, and 2 are triples. There is an alternative to one triple, but it's much more likely that people will walk along their desire lines here, so are likely to walk a lot in the cycletrack (the video has great example at 0:56). So, even if not a triple, it'll be poorly segregated.


Carter Railway Bridge Update Video
Go HD see * at bottom


0:00 Devonshire Road onto Bridge
0:31 From Bridge into Station
1:08 From Station onto Bridge
1:50 From Bridge onto Devonshire Road
2:08 From Bridge into Ravensworth Gardens


And here's a brief look at the markings
Go HD see * at bottom


Markings from bridge around



Review

First, the widening is a great relief. The small bollarded space was really difficult to negotiate when bikes are coming from both directions. This is made more important given pulling into the space from the road is not taken as a priority. This is because for those coming down from the bridge the cyclelane continues on. This potentially puts people pulling across a traffic lane at risk if suddenly they have to stop.

For someone walking, I think the width might increase the desire to look a bit more. I'm not sure it increases anxiety of crossing much. Whilst I could understand someone not liking it as much, I'm not sure if there's that much conflict here, given the numbers of people riding and walking isn't congested. It's not like a continuous stream of either mode.

Now, the additional ramp into the station. Again, this is clearly much better than before. Prior to this people riding either crossed Devonshire Road twice or, much more likely, stuck to the footway putting them in conflict with people walking. This ramp is definitely removing that conflict and inconvenience.

The section under the bridge is a big improvement on the old wobbly narrow route shared between walkers and riders, although that did go a while back. This has managed to get away from the rigid square system that is the unimaginative way of optimising car parking space. Having motobike parking here is a good thing, although it needs to be properly set up. They take up different spaces. Again, this needs to be monitored as the station develops.



Can This Development Be Done Better

So looking at the current update, what could be done better. A few simple things spring to mind.



Action 0! This is additional to the plan, but is needed whatever.

There is a parking bay on Devonshire Road just towards Tenison Road (left of plan) right next to the cyclelane. This appears on the video at 2:02.It is really dangerous and people riding should avoid being in the cyclelane here to ensure not riding in the door zone. I'd like to see the design of this parking bay changed. It'd be better if it swapped with the pavement, putting the any parked cars well back from the road with a high dropped kerb to get over to access it. This will ensure walker priority and remove the danger of the car door opening in front of someone riding. If this isn't good enough, remove the bay entirely, it's just not safe.

Action 1. Swap the cycletrack and footway towards the base of the ramp heading onto Devonshire road. This reduces the cycletrack crossings for anyone walking down the bridge and going on towards Tenison Avenue (to the left of the plan) from having to do it twice to doing it once.

Also, a slight kink in the cycle track may well act to slow some down. This should not be as much to mean different directions come into conflict. This does mean those travelling faster have to handle 2 places where walkers are crossing. So maybe understandable that it's not happened like that.

Action 2. Make sure the footway under the bridge to the steps is properly allocated. This means take out the wrongly placed red tarmac but also to make sure, by the final development of the car park, that footways are properly kerbed.

Action 3. Place a properly kerbed footway to the west (right) of the cycletrack under the bridge all the way to Devonshire Road. This reduces the cycletrack crossings for anyone walking from the station onto Devonshire Road toward Mill Road (above plan) from 3 down to 1 and stops desire line walking in the cycletrack. The video has great example at 0:56 of this desire line walking. This may result in losing a bit of one car parking space. Or converting it to two motorbike places?

Now, looking at where people walking have to cross people riding, the source of most conflict in a properly segregated scheme. So, if walking along:
  • Bridge - Devonshire (towards Tenison Rd, left of plan): C 
  • Bridge - Devonshire (towards Mill Rd, above plan): E
  • Bridge - Station: F
  • Station - Devonshire (towards Tenison Rd): F, A, and D
  • Station - Devonshire (towards Mill Rd): G
  • Along Devonshire: B and D
That's a total of 9 crossings, with just a double and a triple, much better than the current system.


Can It Be Done Better By Doing It Different

The comments on Cyclescape, thought up two more ideas.

Option 1. The latter was to place a ramp on the other side of the bridge to the steps. This massively reduces the number of cycletrack crossings by people walking, although there still is the important one at the base of the bridge ramp next to Devonshire Road.



One of the issues that might have stopped this is the amount of space needed for a ramp like this. Look at the length of the current ramp (in red). It would need to be that long to maintain a reasonable gradient. That takes the full car park in either direction (in yellow), taking a lot of car parking spaces. Addionally, it'd limit the space available for routes in underneath it from Devonshire Road (from the north). It may be possible to do it a little better by looped ramp (in green), but that may take out just as many car parking spaces.

Whilst we like to reduce the ability of car users to come in and congest the city, at some point we do need to acknowledge that the station makes money out of these people. So, I can see that this plan has more conflict over it, especially on non County Council land.

Option 2. The other idea was to make a route through Ravensworth Gardens. There is a path through the estate although it's not noted as a cycle route on the County Council cycle maps. As it's away from a road it's not illegal to ride here, unless there's some specific bylaw in place. Also, with the dropped kerbs it's clearly used as a vehicle access route, which would make it very difficult to legally stop riding here. The only fly in the ointment here might be that it's possibly a private development. In which case a number of issues may arise.




So the route round would look a bit like this. Note that the reduces the cycletrack crossings for anyone walking but almost certainly increases the crossings within the car park. The car park could be rearranged to reduce this again, but inevitably some crossings would remain.

Also, the most awkward part of this plan is the access from the base of the bridge ramp onto Devonshire Road. I'm not sure about adding in another well used route into this junction at the same place is necessarily a good idea. Especially considering the next point.

Another issue is that by opening the route up for people riding, it's also doing so for people walking, because this is on a desire line. So the walk through Ravensworth Gardens will have people in both modes side by side still. Quite how that works out, is not so clear. At the moment, it's a shared-use path to the north, which has limited development potential as it's an vehicle access as well.

Once of this path, it's back onto the road, albeit a very quiet one. There's a junction to negotiate and quite a bit of residential parking. This could be limited, with a level of resident discontent.



Once in the car park, there's a number of possible routes under the current configuration. It will involve a turn at some point, unlike the current system which is simply straight along teh main car park road.

Summary

So, there are some definite improvements on the prior arrangement. Time will tell as to whether the crossings, where people cycling and walking interact most, are sufficient and logical for both groups.

The station car park clearly needs a few simple updates, which is very possible given the mid stage of current development plans.

Whilst this has already happened, other schemes may have been a little bit better. Although they'd have to be some considerably larger change to make them the best they could be.











* How to go HD.







Thursday, 28 January 2016

#CamRideHome on January 29th 2016



Join us on #CamRideHome this Friday for a leisurely social ride starting at 6pm at The Mill, Cambridge. Then a pint after to talk about anything worth a good natter about!

The Ben Hayward Cycles inspired rides on with a quick look to the East. A run along the updated Tins path, looking at crossing Cherry Hinton Hall grounds, and a nice back route through to Hills Road bridge from the Cherry Hinton Road side.

We'll look at these and a few other useful links that help riders get through awkward places.








And here's the video of the route, with a few comments below and Nick Cave and the Bad Seeds giving an extended version of There She Goes my Beautiful World!

The East and the new Tins path (Go HD see * below)

0:00 Leaving The Mill
0:20 Being overtaken by a car about to turn left
0:23 The joys of a quiet Regents Terrace
0:30 Watching being counted by the Gonville Place cycle counter
0:37 The "wiggly path", the alternate route to Hills Road, quiet but not convenient
1:02 Carter Railway Bridge
1:22 Cut through to Mamora Road going on to Brookside
1:32 Cut through to Natal Road and Brookside
1:53 The recently updated bridge onto The Tins path
2:04 Crossing the railway over poorly sighted narrow bridge
2:21 New The Tins path! Don't blink though
2:26 Back to shared-use
2:29 Back to old narrow path
2:37 Clogged Cherry Hinton Road, just too many people driving
2:45 Back towards Daws Lane and Cherry Hinton Hall
2:54 Daws Lane
3:03 Cherry Hinton Hall, very dark, need a good front light
3:11 Exit to the left of the main gate
3:13 Shared-use path on Cherry Hinton Road footway
3:31 Birdwood Road, always pay attention round parked cars here
3:46 Perne Road roundabout
3:31 Radegund Road, rarely use cycle slips here as parked cars usually too close
4:20 Cut through to Clifton Road
4:34 Odd cyclepath on footway, use carefully to get to front of traffic
4:45 Hills Road bridge, with close bus
4:52 Carefully pulling onto Brooklands Avenue cyclepath, difficult in traffic
5:07 Coe Fen, very dark, need a good front light, look out for dogs!
5:30 Pulling well forward at Fen Causeway crossing to allow passing behind
5:49 The Mill, and a pint!


The Tins.


So, The Tins path itself. It's good. And it's good to see that this kind of thign can be done. It needed private developer agreement. There's clearly defined priority and guidance for both walking and riding. Time will tell if the pedestrian section is wide enough that people don't stray into the riding section too much.

It's, shall we say, quite short! And it was quite expensive. That's almost certainly down to the lighting. I'm guessing the development did try to get a quick gain on this as the rest of the route still remains relatively poor. It's probably that the section after Orchard Estate is still narrow and dark. There is space to improve this area but it may require more agreements than this development was prepared to get.

At the end there's a clear indication that more people need to get on their bikes. Cherry Hinton High Street clogged with traffic. It's clogged because as 2 lines of car traffic join (near the church), it needs to be managed to get two lines of big vehicles together into one. Bikes don't need this space. Thus, the jam is caused by too many people using vehicles that are too big for our streets.

The "wiggly path".


The "wiggly path" from Regents Street/Terrace is a reasonably quiet pleasant way to head this way. It's meant to be a replacement for travelling down Mill Road or Hills Road to the station. And it is, reasonably quiet. However, it's not convenient, involves a lot of twisting and turning. Unsurprisingly, Google Maps (with Sustrans support) take the route down Mill Road, it's over 20% shorter to Brookside.


Cherry Hinton Hall.

Next to Daws Lane is the useful green space, Cherry Hinton Hall. This connects through to the south of Cherry Hinton Road. Good front lights are useful to negotiate the darker paths here. The exit is to the left of the main gate, taking you towards a crossing to the south side of Cherry Hinton Road.The footway on this side is also a shared-use space. Note this shared-use path goes through a bus-stop. Another example of shared space between people riding and using public transport. The new style bus-stop, now on Hills Road and proposed in other pace with cycle space separated would seem a much better idea.


Clifton Road Cut Throughs.

Near Clifton Road there are two cut-throughs that help move riders to the front of traffic at Cherry Hinton Road junction onto Hills Road. The last one, along the pavement next to Cherry Hinton Road is very awkward to use and should only be used with great care. There's a good chance that you could end up delivered into trafffic just as it starts to move. It's almost certainly better to use the Clifton Road junction if the lights are green.




* How to go HD.

Tuesday, 27 October 2015

#CamRideHome October 30th 2015 - Hills Road Review


Join us on #CamRideHome this Friday for a leisurely social ride starting at 6pm at The Mill, Cambridge. Then a pint after to talk about anything worth a good natter about!

The Ben Hayward Cycles led #CamRideHome is to go along Hills Road and look at the newly installed infrastructure this October. I'm the temporary route guide for this month as Rob has been called away at short notice.

Also, we'll go along a few useful links that help riders get through awkward places.